Deploying a Hardware Edge Using Zero Touch Provisioning

Prev Next

What steps are required to bring up my Hardware Device?

Back view of a network device showing various ports and power connections.

* Lanner 1515 Model 

Booting Up: 

  1. Unpack the device.

  2. Identify the white power button labeled (C) in the diagram on the back lefthand side of the device to power up the unit. In certain models, it may require a screwed-in power cable to secure. 

  3. Push the Power button (C) on the back of the device.

  4. Identify and connect port #1 labeled (F) in the diagram to an ethernet cable . 

  • Dynamic Connectivity - The device will connect automatically

  • Static Connectivity -  A second cable will be needed. Plug in a second cable into the device and use your laptop to complete the installation process by using the local web server on the edge.

  1. Complete remainder of cabling.

  2. Set up for the device is complete and onboarding of the new hardware edge device begins.

Next Step:

With the edge deployment complete it can now be onboarded using the Graphiant portal.