Graphiant & Partner RACI Matrix

Prev Next

Task

Sub-Task & Description

Graphiant

Partner

Architecture & Design

High Level Design (HLD)

R, I

A, C

Low Level Design (LLD)

R, I

A, C

Migration Plan

R, I

A, C

OSS Integration Preparedness

R, I

A, C

Product Development

Network as a Service

R, A

C, I

Business Modelling

R, A

C, I

Process Flow

R, A

C, I

Product Bundling

C, I

R, A

Whitelabeling

C, I

R, A

Order Processing

New Core Hardware Procurement

C, I

R, A

Azure

C, I

R, A

Software (GNOS) Procurement

R, A

C, I

Enable Hardware in Portal

R, C

A, I

Network Connectivity Procurement Core-to-Core

C, I

R, A

Gateway

Physical Installation & Onboarding

R, I

A, C

Gateway Configuration

R, I

A, C

Post deploy Validation

R, I

A, C

Monitoring (Cloud Interconnect)

R, I

A, C

Network Monitoring & Management (NMS)

Dell Core Nodes

R, C

A, I

Core Network Capacity & Performance

R, A

C, I

Azure

R, A

C, I

Azure Control Plane

R, A

C, I

Core GNOS

R, A

C, I

Orchestration

Orchestration of Core

R, A

C, I

Lab Build Out

Design & Build Solutions Lab

R, A

C, I

Support

Break Fix – Level 1 & 2

C, I

R, A

Break Fix – Level 3

R, A

C, I

Hardware Replacement

C, I

R, A

Circuit Management, including (but not limited to) POP interconnects, cloud on-ramp and CPE last mile connections

C, I

R, A

Change Management – Configuration & Software

R, C

A, I

Ticket System Integration

Integrate Ticketing Systems

R, I

A, C

Training & Development

Providing [Partner] Solution Training

R, A

C, I

OSS Integration

Leverage API for Tool Integration

R, C

A, I

OSS integration for Monitor & Alerting

R, C

A, I